Q780. Different daily cover materials can be used throughout the year on the working face of a landfill. The surface area can change as additional lifts of waste are added. At what point in the year should the surface area measurements be taken?

 

A780. 40 CFR Part 98 Subpart HH does not specify a time-frame for determining the soil cover surface areas.  We recommend that the surface areas be estimated during the first half of the reporting year because methane generation generally does not begin until the waste has been in the landfill for three to nine months.  We also recommend that the time-frame when this area determination is made be consistent from year to year.  Note that facilities reporting under Subpart TT for industrial waste landfills are specifically required to make this area determination at the start of the reporting year [see § 98.466(b)(2)]

 


Show If
special@authenticated
Footer / References Bar which is Visible to the public
Wiki Markup
{show-to:group=confluence-Users}{_}Footer / References Bar which is Visible to the public{_}{show-to}
Panel

Updated on

Page info
infoTypeModified date
typeFlatmodified-datemodified-date
dateformatdd/MM/YY HH:mm

Show If
special@authenticated
Info

Source: Rachel Schmeltz,

Wiki Markup
{show-to:group=confluence-Users} {info} Source: Rachel Schmeltz,

2/6/2014

(HH_RY2013_FAQs_v2_2-6-2014.docx)

.

Approval

/

Publishing

History:

Version

 Version 1,

archived

2/19/2018

.

Expiration:

none Relevant

None

Relevant Subparts:

Subpart HH {info}{_}History Panel For Internal Use - Not Visible to the Public{_}{show-to}

 Subpart HH


History Panel For Internal Use - Not Visible to the Public

This web site is maintained by a contractor to the U.S. Environmental Protection Agency (RY2021.R.02)